TERMINAL COSTA CRUISES

In the new dock of Savona was made the Second Costa Crociere Palacrociere Terminal. The building an almost all-transparent body divided into three floors, with numerous windows and structured on a mesh of circular metal pillars.

This building is engaged in the activities of passengers’ embarkation and disembarkation, and is connected to the pre-existing terminal by a bridge made of a glass.

CLIENT
Costa Crociere

 

DESCRIPTION
TERMINAL COSTA CRUISES
Savona
Italy

 

SCOPE OF WORK
Stick Facade
32.300 Sq Ft

 

ARCHITECT
Studio vicini

 

YEAR
2014

> Steel and glass curtain walls for cutting-edge architectures <

Headquarters:


Aghito Zambonini SPA
Via Spinazzi 15/17
29017, Fiorenzuola d'Arda (PC)


t. +39 0523242711
f. +39 0523242798


C.S. 4.000.000€ i.v.

All rights reserved @AghitoZambonini S.P.A 2016

logo-AZA

Fabrication Plant:
Aghito Zambonini SPA
Via Colombo 8
35027, Noventa Padovana (PD)

 

t. +39 0523242711
f. +39 0523242798

 

MAIL: info@aghitozambonini.com
LEGAL & PRIVACY
DISABILITA USO DEI COOKIES
RICHIESTA TRATTAMENTO DATI GDPR

fb_1 twitter_1 you_tube instagram instagram

Utilizzando il sito, accetti l'utilizzo dei cookie da parte nostra. maggiori informazioni

Questo sito utilizza i cookie per fornire la migliore esperienza di navigazione possibile. Continuando a utilizzare questo sito senza modificare le impostazioni dei cookie o cliccando su "Accetta" permetti il loro utilizzo.

Chiudi